Case study - Immergas Magis Combo in 1970s Co. Cork house

Case study - Immergas Magis Combo in 1970s Co. Cork house

Like many houses of this age, this 180m2 1970s house in West Cork had some basic upgrades such as a pumped cavity, attic insulation, and improved glazing, but no other significant measures.  The primary heat source was a LPG boiler. The owner was conscious of energy usage and their carbon footprint and...

Read more

Case Study - Newbridge Fire Station - 64kW Magis PRO Cascade

Case Study - Newbridge Fire Station - 64kW Magis PRO Cascade

Four no. Immergas Magis PRO V2 heat pumps were installed at Newbridge Fire station in County Kildare during a recent energy upgrade. The Magis PRO is suited to many domestic and light commercial applications.  In this case, it helped meet all the project's objectives -  to reduce carbon emissions,  minimise...

Read more

Domestic Heat Pumps Technical Catalogue 2022

Domestic Heat Pumps Technical Catalogue 2022

RVR Energy Technology can supply a heat pump for any project – whether New Build, Retro-fit in recent homes or Retro-fit in older homes. Our technical catalogue - which is handy for installers and other technical customers - contains information such as dimensions, capacities, connections, specifications, schematics and more for our entire range of...

Read more

Case Study - MEX VSX Heat Pumps at Bethany House Nursing Home

Case Study - MEX VSX Heat Pumps at Bethany House Nursing Home

RVR Energy Technology commissioned four no. Thermocold MEX VSX Heat Pumps at Bethany House Nursing Home in co. Westmeath towards the end of 2021. A large extension was built with 31 new bedrooms and a basement incorporating stores, laundry, toilets, and plant area.   It was crucial to maintain a comfortable temperature...

Read more

Case Study -72.3kW Thermocold chiller at Clones Credit Union

Case Study -72.3kW Thermocold chiller at Clones Credit Union

RVR Energy Technology recently commissioned a 72.3kW Thermocold A/W chiller at Clones Credit Union in Co. Monaghan. The installation replaced an existing chiller - the objective was to provide efficient air conditioning while minimising running costs and ensuring long-term reliability. The newly installed Domino SEA - which can deliver chilled water...

Read more